Location: Honolulu, Hawaii
Scheduled trial period: 2 weeks. April 6th - 23rd 2011.
Trial goal: Significantly reduce algae to a minimum in the water fixture at the hotel's main entry.
Note: The water fixture does not have a filtration system and has to be vacuumed every other day, due to algae
build-up.
|