Call Today (808) 395.2996

A COMPLETE LINE OF ENVIRONMENTALLY FRIENDLY

NANO-TECHNOLOGY SURFACE AND WATER TREATMENTS

 
 

HOMEHYDROFLOW: INTROAPPLICATIONPRODUCTSTECHNOLOGYFAQWARRANTYCASE STUDIES

 
 
     

Surface Protective Coatings

• Introduction

• Technology

• Tiles & Grout

• Stainless Steel

• Stone & Cement

• Warranty

• Glass » Technology » FAQ

• About Nano Tek-On

• Testimonials

• Case Studies / Field Tests

• Contact Us

Warranties

NanoTek-On carries a diverse range of products for a wide spectrum of applications

   

HydroFlow - Case Studies / Field Tests

 

Ice Machine - The Waianae Store » pdf file

 

Location: Oahu, Waianae Hawaii


Case study: 165 days


Goal: Significantly reduce scale build up in Ice machine

 

Installation Details

 

Model of Water Conditioners: S38


Pipe Material: PVC


Installation location: between the filtration pump and the filter


Installation Date: June 2, 2011

 

 

Ice Machine

A S38 water conditioner was installed June 2, 2011. At which time all filters were shut off

 
 
 

 

 

Limescale build up, before HydroFlow, formed typically in 3 months even with the water filtration. After the installation of HydroFlow there is almost no scaling, only a soft gel paste which is very easy to remove.

 

Field Conclusion

 

Limescale build up reduction: The increased performance was noticeable within 20 days.


Maintenance: The property conducts quarterly cleaning and inspection regardless. The ice machines quarterly
maintenance and cleaning is taking 1/6 of the time or less, which is a substantial savings in labor. It was also
noticed that the ice produced is clearer.
Hydroflow will improve the performance of the equipment through out the quarter, and reduce maintenance.


Estimated Return on Investment due to maintenance cost savings: 12 to 18 months.