Call Today (808) 395.2996

A COMPLETE LINE OF ENVIRONMENTALLY FRIENDLY

NANO-TECHNOLOGY SURFACE AND WATER TREATMENTS

 
 

HOMEHYDROFLOW: INTROAPPLICATIONPRODUCTSTECHNOLOGYFAQWARRANTYCASE STUDIES

 
 
     

Surface Protective Coatings

• Introduction

• Technology

• Tiles & Grout

• Stainless Steel

• Stone & Cement

• Warranty

• Glass » Technology » FAQ

• About Nano Tek-On

• Testimonials

• Case Studies / Field Tests

• Contact Us

Warranties

NanoTek-On carries a diverse range of products for a wide spectrum of applications

   

HydroFlow - Case Studies / Field Tests

 

Steamer - Marriott Koolina Beach Club » pdf file

 

Location: Oahu, Kapolei Hawaii


Installation: S38 installed September 15, 2011


Goal: Significantly reduced scale build up in a steamer

 
K
 

Field Conclusion


Limescale build up reduction: The increased performance was noticeable within 14 days.


Maintenance: the piping inside the steamer was getting cleaned every 2 week before the installation of Hydroflow.


After the installation of HydroFlow the by monthy cleaning was no longer necessary as the pipes in the
steamers were not clogging with limescale any more, in fact there was a soft paste instead of the hard scale.


During the quarterly cleaning; it was noticed that the scale deep in the steamers was soft and did not have to
be removed with a wire brush, just a soft scrub was used


The future quarterly cleaning is expected to have no build up at all.


During annual inspections we may just see a thin white paste in the pipes, that can be removed with one wipe
using a soft nylon brush.


Estimated Return on Investment due to maintenance cost savings: 12 months or less.