Call Today (808) 395.2996

A COMPLETE LINE OF ENVIRONMENTALLY FRIENDLY

NANO-TECHNOLOGY SURFACE AND WATER TREATMENTS

 
 

HOMEHYDROFLOW: INTROAPPLICATIONPRODUCTSTECHNOLOGYFAQWARRANTYCASE STUDIES

 
 
     

Surface Protective Coatings

• Introduction

• Technology

• Tiles & Grout

• Stainless Steel

• Stone & Cement

• Warranty

• Glass » Technology » FAQ

• About Nano Tek-On

• Testimonials

• Case Studies / Field Tests

• Contact Us

Warranties

NanoTek-On carries a diverse range of products for a wide spectrum of applications

   

HydroFlow - Case Studies / Field Tests

 

Japanese Pond - Honolulu International Airport » read more

 

Location: Honolulu Hawaii USA
Installation date: May 05, 2013
Purpose of Installation: Reduce water use, improve water clarity and reduce maintenance

 

Model of Water Conditioners: HS48 x 2 and J62 x 1
Pipe Diameter (OD): 2.38" by the pump

Pipe Material: PVC
Installation Location: Filtration and circulation pump

 

Results

1. Reduced the use of make up water
2. Reduction of algae in 15 days.
3. The water became clear.
4. Reduction of algae on the bottom of the pond
5. Reduction of manual cleaning.
6. Reduction of frequency and time of backwash.

 

Important issues to note regarding pond.
Not only is the water visually cleaner and clearer, but the fish have a healthier environment to live due to the killing of the bacteria in the water, by HydroFlow's effect.

 
 

Cooling Tower - Central Pacific Plaza » read more

 

Location: Honolulu, Hawai ‐ USA
Application: Two 300 ton cells and one 75 ton cell ‐ One 300 ton cell operates during the day, one 300 ton cell is on standby and the 75 ton cells operates during the night
Unit: HydroFLOW 14" Custom on a 12.78" Outer Diameter Cast Iron Pipe
Goal: Keep biological growth, scale accumulation, corrosion rate under control using minimal chemicals
Timeframe: Trial began on January 22, 2013 and ended on April 22, 2013


Evaluation Protocol:
• Weeks 1-2: No chemical reduction. Biological water tests to be compared to baseline data after 15 days. Scale and bio accumulation to be compared to baseline pictures.
• Weeks 3-5: Scale/corrosion inhibitors and biocide to be reduced to 75% (25% reduction). Biological water tests to be compared to baseline results after 5 weeks. Scale and bio accumulation to be compared to baseline pictures.
• Weeks 6-9: Scale/corrosion inhibitors and biocide to be reduced to 50%. Biological water tests to be compared to baseline results after 9 weeks. Scale and bio accumulation to be compared to baseline pictures.
• Weeks 10-12: Customer to decide if scale/corrosion inhibitor and biocide can be reduced to 25% (75% reduction). Biological water tests to be compared to baseline results after 12 weeks. Scale and bio accumulation to be compared to baseline pictures.

 
 

Cooling Tower - Marriott Koolina » read more

 

Application: 500 Ton Cooling Tower.

Installed unit: HydroFLOW Custom 14" water conditioner on a cast iron pipe feeding the chillers.

Water source: Calcium Carbonate hardness of roughly 200 ppm and Silica hardness of roughly 50 ppm.

Installation date: September 10, 2013.

 

Success factors:

• Reduce chemical usage by up to 75% while keeping the cooling tower readings within acceptable parameters.

• Significantly reduce maintenance costs.

• Reduce blow down water usage by up to 75%.


 
 

Dishwasher - Brasserie Du Vin » read more

 

Location: Honolulu, Hawaii
Installation: One HydroFlow unit installed Feb 16, 2011
Case study: 298 days
Goal: Significantly reduce scale build up in dishwasher

 

Field Test Conclusion

• Lime-scale buildup reduction: Noticeable reduction of lime-scale buildup within 60 days. Noticeable lime scale dissolving within 180 days
• Maintenance: Cleaning is required until lime scale is eliminated; after that no maintenance required.
• Estimated cost savings and benefits: Heat exchangers are working more efficiently; the water heaters will last longer. There will no longer be any accumulation of lime scale in the dishwasher and its performance will increase. Significant reduction of water spots on the glassware.

 
 

Dishwasher - Hilton Waikiki Prince Kuhio » read more

 

Location: Waikiki, Honolulu, Hawaii

Goal: Significantly reduce scale build up in dishwasher

Installation location: on the pump of the filter between the heater and the dishwasher

 

Field Test Conclusion

• Lime-scale buildup reduction: Noticeable reduction of lime-scale buildup within 60 days.

*Note: the maintenance person came to us on March 12, 2012 and thanked us for the solution
supplied, because he no longer had to scrub the inside of the dishwasher, which was an
unpleasant job with no reward.

• Maintenance: "Cleaning and using LineAway is recommended until lime scale" is reduced or eliminated, after that no maintenance required.

• Estimated cost savings and benefits: Heat exchangers are working more efficiently, the water heaters will last longer. There will no longer be any accumulation of lime scale in the dishwasher and its performance will increase. Significant reduction of water spots on the dishes, especially glass.

 
 

Heat Exchange - Bel Aire » read more

 

Location: Waikiki, Oahu, Hawaii - USA
Application: Hot-water heat exchanger
Purpose of Installation: The main concern is to reduce lime-scale buildup in one of the heat exchangers

 

Field Test Conclusion

• Results: Lime scale was gradually removed from the heat exchanges. In  three month’ time, the heat exchanger was working with a heat pressure of 100 psi (normal).
• Estimated return on investment due to maintenance cost savings: less than 12 months.

 
 

Ice Machine - The Waianae Store » read more

 

Location: Waianae, Oahu
Case study: 165 days
Goal: Significantly reduce scale buildup in ice machine

 

Field Test Conclusion

• Lime-scale buildup reduction: The increased performance was noticeable within 20 days.
• Maintenance: The property conducts quarterly cleaning and inspection regardless. The ice machine’s quarterly maintenance and cleaning is taking 1/6 of the time or less, which is a substantial saving in labor. It was also noticed that the ice now being produced is clearer. Hydroflow will improve the performance of the equipment throughout the quarter, and reduce maintenance.
• Estimated return on investment due to maintenance cost savings: 12 to 18 months.

 
 

Koi Pond - Marriott's Ko Olina Beach Club » read more

 

Location: Kapolei, Oahu
Trial Period: 30 days
Trial goal: Significantly reduce algae to a minimum in the water fixture at the hotel's main entry.

Note: The water fixture has a filtration system and most of the time has green (murky water), due to algae.

 

Field Test Conclusion

• Algae reduction: The algae reduced by more than 90%.
• Water clarity: The increased clarity was noticeable within three days.
• Maintenance: The hotel completely stopped the use of UV lighting and algae treatment! And is looking to reduce the use of backwash time and frequency of their five filters.
• Estimated return on investment due to maintenance cost savings: 12 to 18 months.

 
 

Koi Pond - Waikiki Beach Marriott Resort & Spa » read more

 

Location: Waikiki, Honolulu
Scheduled trial period: two weeks. April 6 - 23 2011.
Trial goal: Significantly reduce algae to a minimum in the water fixture at the hotel's main entry.
Note: The water fixture does not have a filtration system and has to be vacuumed every other day, due to algae
buildup.

 

Field Test Conclusion

• Algae reduction: The algae reduced by over 90%.
• Water clarity: The increased clarity was noticeable within three days.
• Maintenance: The hotel completely stopped vacuuming the water fixture!
• Estimated return on investment due to maintenance cost savings: 6-12 months.

 
 

Chinese Pond - Honolulu International Airport » read more

 

Location: Honolulu Hawaii USA
Installation date: December 2011
Purpose of Installation: Reduce water usage, improve water clarity and reduce maintenance

 

Results

1. Reduce the use of make-up water by 100%.

2. Reduction of algae in five days.

3. Improvement water clarity.

4. Reduction of algae on the bottom of the pond

5. Reduction of manual cleaning.

6. Reduction of frequency and time of backwash.

 

Important issues to note regarding pond.
Not only is the water visually cleaner but the fish have a healthier environment to live in due to the killing of the bacteria in the water, by HydroFlow's effect.

 
 

Steamer - Marriot Ko Olina Beach Club » read more

 

Location: Kapolei, Oahu
Installation: S38 installed September 15, 2011
Goal: Significantly reduced scale buildup in a steamer

 

Field Test Conclusion

Lime-scale buildup reduction: The increased performance was noticeable within 14 days.
Maintenance: The piping inside the steamer was getting cleaned every two weeks before the installation of Hydroflow. After the installation of HydroFlow the semimonthly cleaning was no longer necessary as the pipes in the steamers were not clogged with lime scale anymore; in fact there was a soft paste instead of the hard scale. During the quarterly cleaning; it was noticed that the scale deep in the steamers was soft and did not have to
be removed with a wire brush. Just a soft scrub was used. The future quarterly cleaning is expected to have no buildup at all. During annual inspections we may just see a thin white paste in the pipes, that can be removed with one wipe using a soft nylon brush.
Estimated return on investment due to maintenance cost savings: 12 months or less.

 
 

Water Fixture - Alakea Tower » read more

 

Location: Honolulu, Hawaii

Application: Commercial Pond

Purpose of Installation: Improve water clarity and reduce maintenance

The Recommended Solution: HydroFlow Technology

 

Results

• The water improvement was noticeable from 9/20/11 to 10/06/11.

• 10/24/11 inspection; the water fixture and the surrounding granite had just been cleaned, therefore no difference was recorded.

• A reduction of 50% of chemicals was achieved.

• The granite is no longer being stained by the chemicals in the water.

• The water fixture has not been drained in the last 2 1/2 months and water is perfectly good, by that, saving 2500 gallons of water each time.

 
 

Water Fixture - Topa Tower » read more

 

Location: Honolulu, Hawaii | First inspection: 9/20/11

Application: Commercial Pond

Purpose of Installation: Improve water clarity and reduce maintenance

 

Results

• Reduction of chemicals in the order of 80% to 100% depending on the weather. As the weather is good, no chemicals are needed. If there is a heavy rain, 10 to 20% of chemicals may be needed.

 

Nano Tek-On
Environmentally-friendly nanotechnology treatments for Hawaii